Marine engineering schedules are won or lost at mobilisation. Equipment that must be trucked across Lagos, launched from a borrowed jetty and assembled on arrival loses days before the first cubic metre moves. Surge Forte operates from three dedicated waterfront bases, positioned across the Lagos lagoon system and the eastern corridor, each with direct water access for dredgers, barges and support craft.
Lagos Lagoon SystemAtlantic / Coastal Corridor
Corporate OfficeLekki Phase I
AwoyayaEastern Corridor
LagasaIbeju-Lekki
OretaIkorodu
01
Lagasa Base Primary Stockpiling & Loading
Surge Forte's principal stockpiling and loading site, supplying projects across Ibeju-Lekki and environs and serving the company's network of independent suppliers and distributors.
02
Awoyaya Base Lekki-Epe Corridor · Loading & Fabrication
Loading operations and equipment fabrication serving the eastern development corridor, including the refinery district, the Lekki–Epe Expressway and coastal road works.
03
Oreta Base Ikorodu · Stockpiling, Loading & Fabrication
Stockpiling, loading and equipment fabrication supporting the northern lagoon and Ikorodu corridor, and sand supply into the Lagos mainland development belt.